Services

Range of works-SERVICES

ECI MARINE SERVICES LTD is a truly EPC contractor for electrical projects, with a strong know-how being able to minimize drydocking time. We have the capability to provide all these services worldwide:

  • BNWAS -Bridge Navigation Watch Alarm System
  • Drydocking jobs: Bridge equipment works, Engine Room equipment works
  • Scrubber installation and commissioning
  • Chiller installation and commissioning
  • Marine Fuel Efficiency Management-Flow meter consumption system
  • Ballast Water System installation and commissioning
  • HVAC electrical works
  • Medium and Low voltage woks
  • Power distribution- equipment cabling, installation and set-up for Power panels, Transformers, UPS, etc.
  • Automation and Control Systems
  • CCTV- Surveillance and Security systems
  • Wi-Fi Communication systems
  • Electrical works for the main engines, diesel generators
  • Fire detection and prevention systems
  • Troubleshooting
  • General electrical services for revitalization and refurbishment
  • Present water system installation

Scrubber systems

Scrubbers or Exhaust Gas Cleaning Systems (EGCS) are used to remove particulate matter and harmful components, such as sulphur oxides (SOx) and nitrogen oxides (NOx) from the exhaust gasses generated as a result of combustion processes in marine engines, to implement pollution control.

These exhaust gas scrubber systems have been developed and employed to treat exhaust from engines, auxiliary engines and boilers, onshore and onboard marine vessels, to ensure that no damage is done to human life and the environment by toxic chemicals.

The International Maritime Organization (IMO) regulations mandate that the sulphur content in fuels, which is carried by vessels, has to be limited to 0.50% globally and 0.10 % m/m in ECAs (Emission Control Areas; The Baltic Sea Area, The North Sea area, The United States, Canada, and the United States Caribbean Sea area).

Today’s situation- Where we have worked

  • ENCHANTMENT OF THE SEAS- RCCL- Chiller installation/Scrubber/HVAC
  • HANNAH KRISTINA- HALLIBURTON- Victaulic coupling installation
  • AIDA DIVA- CCL Germany- Survey report for scrubber installation/ BWTS installation
  • AIDA BLU-CCL Germany- Survey report for scrubber installation/ BWTS installation/Manpower rental
  • FAVOLOSA- Costa Italy- Survey report for scrubber installation
  • ARCADIA- CCL UK- Survey report for scrubber installation
  • GRANDEUR OF THE SEAS-RCCL-Fibre optic installation
  • SERENADE OF THE SEAS-RCCL-HVAC (ventilation ducts/piping works)
  • TIRRENO TUG BOAT- EVERBLACKS- Troubleshooting/PMS replacement in partnership with ABB Italy
  • AIDA BELLA- Electrical installation for Scrubber System
  • CELEBRITY ECLIPSE- Electrical installation for BWTS
  • AIDA LUNA- Present Water system installation
  • MSC POESIA-Scrubber electrical installation
  • CELEBRITY SILHOUETTE-BWTS Commissioning
  • CELEBRITY MILLENIUM-Chiller electrical installation
  • AIDA SOL-Scrubber electrical installation
  • AIDA SOL-Present Water System installation
  • INDEPENDENCE OF THE SEAS-BWTS Commissioning
  • GRANDEUR OF THE SEAS-BWTS installation
  • CARNIVAL PRIDE-Scrubber update
  • CARNIVAL PRIDE-VFD power supply modification
  • CARNIVAL PRIDE-Mechanical works
  • AIDA MIRA-Scrubber electrical installation
  • VIKING STAR-Scrubber update
  • VIKING STAR-Heat Energy Recovery System installation
  • PGS RAMFORT HYPERION-Mechanical installation
  • PGS RAMFORT HYPERION-Scrubber electrical installation
EMS 1